Jefferson Dr Reconstruction Project
5-17-2024 Jefferson Drive Update
Sod placed last year has went through its maintenance period and is now the homeowners responsibility. Tips to care for new sod are posted below (see links.)
10-23-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Blacktop Pavement is scheduled for Monday October 23rd. Blacktop pavement will be completed from Highway 58 to 1st Street.
The 5th Street intersection will be closed for a few days when preparing for and placing blacktop pavement. Traffic will be detoured to 4th Street during this time.
Users of the 1st Street should expect delays during the paving operation.
Flaggers will be present during paving operation to direct traffic. Please follow their direction.
Roadway & crosswalk markings will be applied after blacktop is completed.
Disturbed areas north of Mill Street will be seeded and sodded.
Portions of Jefferson Drive are still closed to give the contractor room to complete the work. Please follow traffic control signage. Current Traffic Pattern shown below:
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
10-11-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Blacktop Pavement is scheduled to start the week of October 16th. Blacktop pavement will be completed from Highway 58 to 1st Street. Roadway & crosswalk markings will be applied after blacktop is completed.
Disturbed areas north of Mill Street will be prepped for seed and/or sod. Seed and sod placement will start the week of October 16th.
Portions of Jefferson Drive are still closed to give the contractor room to complete the work. Please follow traffic control signage. Current Traffic Pattern shown below:
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
10-4-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Dubuque Boulevard to Marie Lane will receive the final lift of blacktop. Roadway & crosswalk markings will be applied after blacktop is completed.
Disturbed areas north of Highway 58 will be prepped for seed and/or sod. Seed and sod placement will start the week of October 16th.
Concrete curb & gutter and concrete driveway aprons from Lincoln Avenue to 6th Street and at the intersection of 1st Street will be placed on Monday 10-9 and Tuesday 10-10.
Portions of Jefferson Drive are still closed to give the contractor room to complete the work. Please follow traffic control signage. Current Traffic Pattern shown below:
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
9-27-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Blacktop Pavement is scheduled to start September 28th. Phase 1 & 2 will receive the final lift of blacktop pavement. Phases 3 & 4 will receive all 3 layers of blacktop pavement. Phases 5 & 6 will receive the first two layers of blacktop pavement on areas that have concrete curb & gutter.
Work in Phase 1 & 2 (Highway 58 to Dubuque Boulevard)
-Care for the new sod is the homeowners responsibility. Tips to care for new sod are posed on the City Website.
Work in Phase 3 & 4 (Larson Drive to Highway 58)
-Seed and Sod disturbed areas.
Work in Phase 5 (5th Street to Larson Drive)
-Construct new roadway and place road rock at Lincoln Avenue Intersection.
Work in Phase 6 (1st Street to 5th Street)
-Reconstruct the 1st Street Intersection. (intersection will remain passable)
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
9-22-2023 Construction update for Jefferson Drive in Zumbrota, MN
Notes on Blacktop Pavement:
- Blacktop Pavement is scheduled for the week of September 25th.
- Blacktop pavement can be driven on minutes after placed and will be cool enough to walk or bike on the next day.
- Flaggers and traffic control devices will be present during paving operation. Please follow their direction.
- Temporary delays to local traffic may occur, especially when paving intersections.
- Emergency Vehicles will have access to the streets at all times.
- The paving operation will likely take place between 6:30 AM and 7:30 PM
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
9-13-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & 2 (Highway 58 to Dubuque Boulevard)
-Care for the new sod is the homeowners responsibility. Tips to care for new sod are posed on the City Website.
Work in Phase 3 & 4 (Larson Drive to Highway 58)
-Seed and Sod disturbed areas.
Work in Phase 5 (5th Street to Larson Drive)
-Concrete curb & gutter and concrete driveway aprons from Larson Drive to Lincoln Avenue on Friday 9-15.
-Pavement removal from Lincoln Avenue to the Private Drive on Monday 9-18. This section of roadway will be closed. -Install storm sewer at the 6th Street Intersection.
-Install watermain and storm sewer at the Lincoln Avenue Intersection.
Work in Phase 6 (1st Street to 5th Street)
-Finish concrete driveway aprons and sidewalk. Install Watermain on the south side of the 1st Street intersection
-Pavement removal and reconstruct the 1st Street Intersection starting Monday 9-18. (intersection will remain passable)
Blacktop Pavement is tentatively scheduled for the week of September 25th for areas that have curb & gutter.
Current Traffic Pattern shown below:
9-8-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & 2 (Highway 58 to Dubuque Boulevard)
-Care for the new sod is the homeowners responsibility. Tips to care for new sod are posed on the City Website.
Work in Phase 3 & 4 (Larson Drive to Highway 58)
-Seed and Sod disturbed areas.
Work in Phase 5 (5th Street to Larson Drive)
-Construct new roadway and place road rock between Larson Drive and Lincoln Avenue.
-Install Storm Sewer from 6th Street working south
Work in Phase 6 (1st Street to 5th Street)
-Concrete curb & gutter and concrete driveway aprons starting Tuesday 9-12.
-Install Watermain on the south side of the 1st Street intersection (intersection will remain passable)
Blacktop Pavement is tentatively scheduled for the week of September 25th for areas that have curb & gutter.
Current Traffic Pattern shown below:
8-30-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & 2 (Highway 58 to Dubuque Boulevard)
-Water Sod as needed.
-Starting Monday September 4th, care for the new sod will be the homeowners responsibility. Tips to care for new sod are posed on the City Website.
Work in Phase 3 (Mayo Clinic to Highway 58)
-Finish Concrete Work on Thursday 8-31.
Work in Phase 4 & 5 (5th Street to Mayo Clinic)
-Construct new roadway and place road rock between Mill Street and Larson Drive.
-Once the Larson Drive intersection is complete Marie Lane will be closed and residents will be directed to use Larson Drive for access.
-Install storm sewer from Marie Lane to Lincoln Ave.
-Install storm sewer, sanitary sewer, and watermain from 6th Street working south.
Work in Phase 6 (1st Street to 5th Street)
-Install Watermain on the south side of the 1st Street intersection (intersection will remain passable)
Concrete curb & gutter and concrete driveways are tentatively scheduled for the week of September 11th for sections of roadway that have been rocked. Blacktop Pavement will follow a week later.
Current Traffic Pattern shown below:
8-28-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & Phase 2 (Highway 58 to Dubuque Boulevard)
-
Water Sod as needed.
-
Starting Monday September 4th, care for the new sod will be the homeowners responsibility. Tips to care for new sod are posed on the City Website.
Work in Phase 4 (Marie Lane to Mayo Clinic)
-
Finish reconstructing the Mill Street Intersection. Intersection will be closed for approximately 1 more week.
Work in Phase 5 (5th Street to Marie Lane)
-
Install storm sewer near Marie Lane.
-
Install storm sewer, sanitary sewer, and watermain from 6th Street working south.
Work in Phase 6 (1st Street to 5th Street)
-
Install Watermain on the south side of the 1st Street intersection (intersection will remain passable)
Concrete curb & gutter and concrete driveways are tentatively scheduled for the week of September 11th for sections of roadway that have been rocked. Blacktop Pavement will follow a week later.
Current Traffic Pattern shown below:
8-16-2023 Construction update for Jefferson Drive in Zumbrota, MN
8-10-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & Phase 2 (Highway 58 to Dubuque Boulevard)
- Water Sod
Work in Phase 4 (Marie Lane to Mayo Clinic)
- Install Storm Sewer, Sanitary Sewer, and Watermain.
- Work in the Mill Street intersection is scheduled from Monday 8-14 to Friday 8-18. Residents should plan to park on the northeast side of Jefferson on Mill Street during this time period.
Work in Phase 6 (1st Street to 5th Street)
- Construct new roadway and place road rock between 4nd Street and 5th Street.
- Install Storm Sewer at 5th Street.
- 5th Street Detour will be shifted from 2nd Street to 4th Street as shown below.
Current Traffic Pattern shown below:
8-2-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & Phase 2 (Highway 58 to Dubuque Boulevard)
-Soil Prep & Sodding
Work in Phase 4 (Marie Lane to Mayo Clinic)
-Complete Box Culvert
-Install Storm Sewer and Watermain
-Remove pavement from the Box Culvert to Mill Street
-The Mill Street intersection will be closed to through traffic once pavement is removed
-Residents on Mill Street will lose access for a period of time when utilities are being installed in the intersection. A temporary access will be provided once this work is completed.
Work in Phase 6 (1st Street to 5th Street)
-Construct new roadway and place road rock between 2nd Street and 5th Street
-Watermain and Sanitary Sewer to be installed at 5th Street
-The 1st Street and 6th Street intersections will remain open
Current Traffic Pattern shown below:
7-26-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & Phase 2 (Highway 58 to Dubuque Boulevard)
-Soil Prep & Sodding.
Work in Phase 3 (Mayo Clinic to Highway 58)
-Concrete driveways are open to traffic.
-Remaining concrete work will be completed at a later time.
Work in Phase 4 (Marie Lane to Mayo Clinic)
-Construct Box Culvert.
Work in Phase 6 (1st Street to 5th Street)
-Storm Sewer to be installed from 3rd Street to 4th Street.
-Construct new roadway and place road rock between 1st Street and 5th Street
-Watermain and Sanitary Sewer to be installed at 5th Street.
-Traffic on 5th Street will be routed as shown below.
-The 1st Street and 6th Street intersections will remain open.
Current Traffic Pattern shown below:
7-19-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & Phase 2 (Highway 58 to Dubuque Boulevard)
-Soil Prep & Sodding
Work in Phase 3 (Mayo Clinic to Highway 58)
-Concrete curb & gutter and concrete driveway aprons on 7-19
-Remaining concrete work will be completed at a later time
-Do not drive on new concrete for 1 week
Work in Phase 4 (Marie Lane to Mayo Clinic)
-Remove pavement from Mill Street to Mayo Clinic
-Remove and replace Box Culvert
Work in Phase 6 (1st Street to 5th Street)
-Utilities to be installed at the intersection of 2nd Street and work their way south
-The 1st Street and 5th Street intersections will remain open
Current Traffic Pattern shown below:
7-17-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 3 (Mayo Clinic to Highway 58)
-Concrete curb & gutter and concrete driveway aprons starting Wednesday 7-19
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
6-21-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & Phase 2 (Highway 58 to Dubuque Boulevard)
-Blacktop Paving is scheduled for Monday, June 26th. During paving operation flaggers will direct traffic. Blacktop pavement can be driven on hours after placed and will be cool enough to walk or bike on the next day.
Work in Phase 3 (Mayo Clinic to Highway 58)
-Construct new roadway and place road rock between the Fire Hall and Highway 58.
Work in Phase 6 (1st Street to 5th Street)
-Pavement Removal from the north side of 5th Street to the South side of 1st Street starting Monday, June 26th. The 1st Street and 5th Street intersections will remain open.
Traffic Pattern Starting June 26th shown below:
6-14-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 & Phase 2 (Highway 58 to Dubuque Boulevard)
-Roadway and path preparation for blacktop pavement. Roadway will be opened to the west as shown below starting Friday 6-16
-Topsoil Replacement and preparation for Sod/Seed.
-This section is scheduled for blacktop paving the week of June 26th. During paving operation flaggers will direct traffic. Blacktop pavement can be driven on hours after placed and will be cool enough to walk or bike on the next day.
Work in Phase 3 (Mayo Clinic to Highway 58)
-Water Hydrants will be replaced on Thursday 6-15. Watermain will be shutdown starting at 9:00 AM and will temporarily affect the area shown in red below.
-Install Storm Sewer Pipe & Structures between the Fire Hall and Highway 58.
-Construct new roadway and place road rock between the Fire Hall and Highway 58.
Traffic Pattern For this week shown below:
5-31-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Wednesday 5-31 to Friday 6-2 (Saturday 6-3 if necessary)
Work in Phase 1 (East of Kwik Trip to Dubuque Boulevard)
*Complete placing road rock from 19th Street past Dubuque Boulevard (Project Limit)
Work in Phase 3 (Mayo Clinic to Highway 58)
*Roadway and driveway pavement will be removed from the Fire hall to Highway 58
*Install Storm Sewer Pipe & Structures
Monday 6-5
Work in Phase 1 (East of Kwik Trip to Dubuque Boulevard)
*Concrete Curb & Gutter and Concrete Driveways.
Work in Phase 2 (Highway 58 to East of Kwik Trip)
*This section of road will be closed - Kwik Trip exits on Jefferson Drive will be closed
*A lane shift on Highway 58 will be put in place early Monday morning. Traffic Control Signage, Cones, and Barrels will be placed on Highway 58 to direct traffic. This will not affect North/South Traffic.
*Roadway and driveway pavement to be removed.
*Construct new roadway and place road rock.
*Concrete Curb & Gutter and Concrete Driveways.
Traffic Pattern Starting Monday 6-5 is shown below:
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
5-24-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 (East of Kwik Trip to Dubuque Boulevard)
-
Road construction will continue to work its way east.
-
Residents on Kailey Lane, Logan Lane, Madison Avenue, and 18th Street should access Jefferson Drive directly once Jefferson is rocked past each street as shown below.
-
Garbage and Recycling containers should be pushed out to Jefferson Drive for collection as they were prior to the project.
-
-
Residents on 19th Street and Dubuque Boulevard will have access switched to 19th Street once Jefferson is rocked past 19th Street as shown below.
Work in Phase 3 (Mayo Clinic to Highway 58)
-
Starting Tuesday 5/30/2023 Jefferson Drive will be closed from the Fire Hall to Highway 58.
-
Access to the Fire Hall, Ambulance Garage, Mahn Funeral Home, Jefferson Heights and the Mayo Clinic will be to the west as shown below.
-
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
5-17-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 (East of Kwik Trip to Dubuque Boulevard)
- Road construction will continue to work its way east from Kwik Trip.
- Once road is graveled past Kailey Lane the following two things will happen:
- Concrete pavement will be removed from 18th Avenue to just west of Dubuque Avenue.
- Local Traffic will be directed as shown below.
Work in Phase 3 (Mayo Clinic to Highway 58)
- Miscellaneous work to begin outside of the roadway.
- Road closure on Phase 3 to start in early June. A separate update at least 2 days prior to closure will be sent out.
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
5-10-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 (East of Kwik Trip to Dubuque Boulevard)
- Road construction will continue to work its way east from Kwik Trip.
- Once road is graveled past Kailey Lane the following two things will happen:
- Concrete pavement will be removed from 18th Avenue to just west of Dubuque Avenue.
- Local Traffic will be directed as shown below.
Work in Phase 3 (Mayo Clinic to Highway 58)
- Traffic Control Signage will be staged on the side of the road.
- Miscellaneous work to begin outside of the roadway.
- Road closure on Phase 3 to start as early as May 22nd. A separate update at least 2 days prior to road closure will be sent out.
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
5-3-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 (East of Kwik Trip to Dubuque Boulevard)
- Road construction will continue to work its way east from Kwik Trip.
- Once Jefferson is graveled past Kailey Lane the following will happen:
- Concrete pavement will be removed from 18th Avenue to just west of Dubuque Avenue.
- Local Traffic will be directed as shown below.
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
4-26-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 (East of Kwik Trip to Dubuque Boulevard)
- Storm Sewer installation will to continue to work its way east.
- Road construction will begin near Kwik Trip and work its way east.
- Concrete pavement will be removed from 18th Avenue to just west of Dubuque Avenue. See Phase 1. During this work the local traffic patter will be as shown below. A temporary gravel road will be constructed from Kailey Lane to the west. Local Traffic Control will block off the road closure.
Resident info
- Zumbrota Mobile Home Park residents should place garbage and recycling containers out to the street in front of their homes on garbage day By 7:30 A.M. Any containers not pushed out to the road will not be collected and emptied.
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
4-19-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 (East of Kwik Trip to Dubuque Boulevard)
- Storm Sewer installation will to continue to work its way east.
- Road construction will begin near Kwik Trip and work its way east.
Resident info
- Dust Control Spray has been ordered and will be applied on 190th Avenue in the near future.
- Zumbrota Mobile Home Park residents should place garbage and recycling containers out to the street in front of their homes on garbage day. Any containers not pushed out to the road will not be collected and emptied.
- To ensure the trash and recycling containers are returned to the proper location the contractor will mark them with your trailer number with permanent marker on duct tape and stick it to the top of the container.
- Localized traffic control will change as construction progresses. Barricades, signs, or cones will block off the active construction area and your travel pattern may need to change based on the construction. For your safety and the safety of construction personal please follow the signage.
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
4-13-2023 Construction update for Jefferson Drive in Zumbrota, MN
Upcoming schedule:
Work in Phase 1 (East of Kwik Trip to Dubuque Boulevard)
- The existing concrete roadway will be broken up and removed from Kwik Trip to Dubuque Boulevard.
- Road construction will begin near Kwik Trip and work its way east.
- Storm Sewer installation will begin near Kwik Trip and work its way east.
- Topsoil will be stripped, salvaged, and hauled away for storage.
Resident info
- Localized traffic control will change as construction progresses. Barricades, signs, or cones will block off the active construction area and your travel pattern may need to change based on the construction. For your safety and the safety of construction personal please follow the traffic control.
Project schedule is weather dependent and subject to change. Updates will continue on a weekly basis and in special circumstances.
The City of Zumbrota will be reconstructing Jefferson Drive from Dubuque Blvd. to West 1st Street in the summer of 2023. The current 20 foot wide concrete road will be removed and be replaced with a 33 foot wide blacktop road with concrete curb and gutter on both sides. The shared use path that currently runs from Main Street to West 1st Street will also be reconstructed and extended to Dubuque Blvd. This project will affect trees, landscaping, and driveway aprons along the corridor.